Commercial · Weybridge, Surrey

Mercedes-Benz World

  • Weybridge, Surrey
  • Commercial scaffolding

The job

What we built

A fully sheeted access scaffold across the glazed frontage of a working visitor attraction, with a full-height stair tower serving every lift. The building stayed open underneath, so containment and a tidy frontage mattered as much as the access itself.

  • Access scaffolding to the full length of the glazed elevation
  • Sheeting wrapped tight to the frame to contain dust and debris
  • Full-height stair tower giving access to every working lift
  • Corner returns tied into the glazed elevation
  • Bays stacked above the entrance canopy without closing it

On site

Photographs

Our own photographs of this job — tap any of them to see it full size.

Mercedes-Benz World, Weybridge, Surrey

Need a quote?

Talk to the people who will actually be doing the job. Tell us what the work is and roughly when you need access, and we will come and price it properly.

  • Free, no-obligation
  • Surveyed before priced
  • Written quote, hire period included

Alpine Scaffolding The team who survey, price and build it

Rather talk it through? 07736 250 242
Call now 07736 250 242 WhatsApp Text us Quote